Construction of hydraulic insulation of concrete and reinforced concrete structures with «Autocryn»® materials
Construction of the hydraulic insulation coating is to be performed by taking into account the requirements of the standard documents:
- Design
- SNiP 3.04.01-98 «Insulating and decorative coatings»
- Typical process chart TK 26/05/01-2000 «Construction of the hydraulic insulation of the concrete surface with «Autocryn» mastic.
- Existing rules of the labour protection and fire safety measures.
Construction of the hydraulic insulation coating with «Autocryn» materials foresees application of:
- «Autocryn» primer TY RB 14511885.001-98,
- «Autocryn» mastic TY RB 14511885.001-98,
- reinforcing materials — polyester cloth for roofing and hydraulic insulation materials TY RB 00204079.146-97 or glass reinforced mesh ÑÑØ-160 TY RB 05780349.017-97.
The solution options of the hydraulic insulation of buildings and structures are shown in table 1.
The process of hydraulic insulating coating formation includes the following stages:
- surface preparation
- priming
- construction of the intermediate mastic layer
- construction of the reinforcing layer
- construction of the protecting mastic layer
1. Surface preparation.
The protected surfaces are to be prepared in accordance with the requirements of:
- SNiP 3.04.01-98 «Insulating and decorative coatings»
- Process chart TK 26/05/33-2000 «Construction of the hydraulic insulation of the concrete surface with «Autocryn» mastic
2. Priming.
«Autocryn» primer is to be applied by means of painting tools, the air or airless spraying.
- Material consumption — 0.8 kg/m2
- • Time of drying at ambient temperature 15-20 °C — 3.0-6.0 hours.
3. Construction of the intermediate mastic layer.
«Autocryn» mastic intermediate layer is to be applied by means of painting tools, the air or airless spraying.
- Material consumption for 1 sublayer — 0.8 kg/m2
- Time of drying before placement of the reinforcing layer at ambient temperature 15-20 °C — 8.0-12.0 hours
- The number of the sublayers to be applied is to be determined in accordance with the design documentation
4 . Construction of the reinforcing layer
The reinforcing material is to be placed overlapped by 100-120 mm and rolled so that there shall be no bulges and waves on the surface.
Drying time before application of the protecting mastic layer at ambient temperature 15-20 °C — 8.0-12.0 hours
5.5. Construction of the protecting mastic layer
«Autocryn» mastic protecting layer is to be applied by means of painting tools.
- Material consumption for 1 sublayer — 0.8 kg/m2.
- ime of drying before placement of the reinforcing layer at ambient temperature 15-20 °C — 8.0-12.0 hours.
Quantity of the applied sublayers is to be determined in accordance with the design documentation.
The total consumption of the mastic may constitute from 3.2 to 4.2 kg/m2
Table 1. Components of options of hydraulic insulation for buildings and structures
Ref. No
| Insulated surfaces | List and sequence of layers of hydraulic insulation | Notes |
| Intention | Vertical | Horizontal |
| Intern. | Extern. | Floors | Ceilings |
 |
| 1 | Water closets of buildings and structures | Õ | - | - | - | 1 layer of «Autocryn» primer 3 layers of «Autocryn» mastic | |
| - | - | Õ | - | 1 layer of «Autocryn» primer 1 layer of «Autocryn» mastic 1 layer of reinforcing material 2 layers of «Autocryn» mastic |
| 2 | Water pools having volume 150-200 m3 | Õ | - | Õ | - | 1 layer of «Autocryn» primer 1 layer of «Autocryn» mastic 1 layer of reinforcing material 2 layers of «Autocryn» mastic | Technical with PH 5.5 (with tiles finishing) |
1 layer of «Autocryn» primer 1 layer of «Autocryn» mastic 1 layer of reinforcing material 2 layers of «Autocryn» mastic 1 layer of reinforcing material 3 layers of «Autocryn» mastic | Technical with PH 5.5 (without tiles finishing) |
| 3 | Chutes for product conduit lines | Õ | Õ | Õ | - | 1 layer of «Autocryn» primer 4 layers of «Autocryn» mastic | |
| 4 | Underground parts of buildings and structures | - | Õ | - | - | 1 layer of «Autocryn» primer 2 layers of «Autocryn» mastic | |
| Õ | - | Õ | Õ | 1 layer of «Autocryn» primer 1 layer of «Autocryn» mastic 1 layer of reinforcing material 2 layers of «Autocryn» mastic | |